Spare Under Floor Moulding for our Southern and L.N.E.R. Coach Kits and 2-bil Kits
Scale: 4mm:1ft (OO, EM, S4)
Quantity: Either: One (1) Underframe Moulding (½ Coach). or
Two (2) Underframe Mouldings (1 Coach)
(Please Note: The picture shows both the front and the back of the moulding.)
Injection Moulded Polystyrene Underframe Parts
Colour: Pewter
These Underframe Parts are from brand new tooling to the same basic dimensions as the original Ian Kirk Parts.
Suitable for both the ExKirk Southern and L.N.E.R. Range of Kits
Contains: One (1) Truss Rod, One (1) Pullman Style Gangway, One (1) Battery Box, One (1) Dynamo, One (1) Vacuum Cylinder and Lever, Ten (10) Roof Vents and Four (4) Short Step Boards.
Parts will require removal from sprues and some trimming of flash may be required.
Edges MAY be sharp and care should be taken when handling.
Extreme Care should be taken when handling sharp knives.
We recommend the use of adhesives from either Carr's Modelling Products or Phoenix Precision Paints Ltd and Paint from Phoenix Precision Paints Ltd.
Care should be taken when handling as we can not accept responsibility for damage to persons or property or caused by handling parts or from knives or adhesives used in the assembly of this kit.